Openfund

CORDIS · CABLEGNOSIS

Life Cycle Center for Power CABLE diaGNOSIS

Код
CABLEGNOSIS
Програма
HORIZON
Процедура
HVAC, HVDC and High-Power cable systems HORIZON-CL5-2024-D3-01-15
Статус
SIGNED
Период
01.09.2024 – 31.08.2027
Принос на ЕС (целият консорциум)5 364 062 €
Принос на ЕС за българските участници338 250 €

Официални данни · CORDIS · синхронизирано 18.10.2026 03:29 · официален запис

Участници

ОрганизацииРоляДържаваБезвъзмездна помощ
EREVNITIKO PANEPISTIMIAKO INSTITOUTO SYSTIMATON EPIKOINONION KAI YPOLOGISTONкоординаторEL655 000 €
UNIVERSITY OF SOUTHAMPTONучастникUK1 030 000 €
UNIVERSITY OF CYPRUSучастникCY425 500 €
ASG SUPERCONDUCTORS SPAучастникIT362 625 €
SMART SUSTAINABLE SOCIAL INNOVATIONS MONOPROSOPI IKEучастникEL328 000 €
CINTECH SOLUTIONS LTDучастникCY314 000 €
IWO PROJECT BVучастникNL312 000 €
KOZHASZNU ALAPITVANY A HUMAN ELEKTROTECHNIKAERTучастникHU310 000 €
FUTURE ENERGY INNOVATIVE TECHNOLOGIES I.K.E.участникEL304 500 €
RINA CONSULTING SPAучастникIT246 500 €
KOMPANIA ZA SAVREMENNI TEHNOLOGIII INOVATSIIучастникBG218 250 €
UNIVERSITY OF GLASGOWучастникUK188 500 €
ECOLE SUPERIEURE DE PHYSIQUE ET DECHIMIE INDUSTRIELLES DE LA VILLE DEPARISучастникFR178 875 €
INALIO LTDучастникUK130 312 €
ЕЛЕКТРОЕНЕРГИЕН СИСТЕМЕН ОПЕРАТОР ЕАДучастникBG120 000 €
Xlinks LimitedучастникUK120 000 €
ARCHI ILEKTRISMOU KYPROUучастникCY120 000 €

Описание

The EU goals for the clean energy transition require at least a 55% reduction in greenhouse gas emissions (from 1990 levels) by 2030, according to the ‘Fit for 55’ package. To achieve these goals, electricity grids will be required to operate in an overall context of 50% electricity production from RES of any scale by 2030. The huge rise in the share of solar PV and wind in total generation fundamentally reshapes the European power system and significantly increases the need to build new HVAC or HVDC cable connections. These will have a crucial role to link islands or offshore wind parks to mainland or to connect countries over long distances. The CABLEGNOSIS project aims to deliver innovative cable technologies that will support the clean energy transition era for the 2050 targets set at European level. CABLEGNOSIS project will develop innovative insulation and conductor design technologies, high performance and environmentally friendly cable insulation materials, ageing studies of superconducting cables, recyclability technologies for the materials used in power cables, as well as pre-fault condition, aging and remote monitoring AI-based tools. A feasibility assessment framework and detailed analysis for the use of superconducting cables for submarine connections. A respective feasibility analysis will be developed for the offshore wind parks in The Netherlands and Germany. The CABLEGNOSIS technologies will be validated in five European countries (Italy, UK, Greece, Hungary, Cyprus). CABLEGNOSIS will deliver a complete deployment plan for supporting the development and operation of efficient, reliable and environmentally friendly cable systems to support the energy transition. The deployment plan will provide the scalability and replicability framework of using the CABLEGNOSIS technologies in future cable development projects, with emphasis in the UK-Morocco interconnection, Cyprus-Israel interconnection, offshore developments in the Aegean Sea.

Официални данни · CORDIS · синхронизирано 18.10.2026 03:29 · официален запис · Лиценз: © European Union, CC BY 4.0 (Commission reuse policy).